A plant manager who wants to cut costs often focuses on reducing labor or squeezing raw material prices. But the biggest costs are often hidden in unrecorded waste, such as goods piling up while waiting to be processed or production that exceeds demand. Lean manufacturing provides an approach to identify and reduce this waste, and it is now increasingly integrated with digital manufacturing. This article covers the five lean principles, the seven wastes, and how to apply them on the production floor.
Lean manufacturing is a production approach that maximizes value for the customer by eliminating waste. Based on the Toyota Production System, the method applies five lean principles and continuous improvement (kaizen), so that resources are used only for activities that create value for the customer.
The five lean principles are a sequence of mutually reinforcing ways of thinking, not just a list. Womack and Jones set them out in the book Lean Thinking (1996) based on a study of the Toyota Production System that Taiichi Ohno developed from the 1950s. MIT researchers popularized the term “lean” through the book The Machine That Changed the World (1990).
The order matters. Before knowing what is valuable to the customer, a factory has no benchmark for separating value-adding work from waste.
The seven wastes are the concrete targets of the five lean principles and are often remembered by the acronym TIMWOOD. Reducing waste is not a one-time project but part of daily kaizen: small improvements carried out by the operators directly involved in the process, not just by a team of experts.
|
Transportation |
Moving material more than necessary |
Materials shuttling between warehouses because of poor layout |
|
Inventory |
Excess stock or WIP that ties up capital |
Piles of half-finished goods waiting to be processed |
|
Motion |
Unnecessary operator movement |
Walking to look for tools that have no fixed place |
|
Waiting |
Idle time within the process |
The line stops, waiting for material or instructions |
|
Overproduction |
Producing more or earlier than demand |
The most critical waste; it triggers the other six |
|
Overprocessing |
Work or tolerances beyond the customer’s needs |
Finishing that the customer does not value |
|
Defects |
Defective products that must be reworked or scrapped |
Double cost: wasted material plus rework |
According to Lean Enterprise Institute, the global lean authority, overproduction is the worst form of waste. Overproduction is the main cause of inventory and waiting. For that reason, tackling overproduction first usually has the biggest impact.
Implementing lean does not start with tools but with seeing. Map the value stream to find where waste hides, then choose the right tool: 5S for motion and searching, kanban for overproduction, value stream mapping for flow. The benefits follow: lower cost, higher quality, faster response to demand.
A common sequence on the ground:
Many people misunderstand and think lean is a program to cut headcount. In fact, lean needs those same operators to run kaizen. If lean is treated only as a temporary cost-cutting project, 5S and value stream mapping will only be effective at first and then abandoned. Lean succeeds when there is a culture of continuous improvement on the production line, not just from using tools.
Waste can only be tackled if it is visible. SAP Digital Manufacturing connects the production floor to the ERP so that WIP pile-ups, waiting times, and defects can be monitored near-real-time, not just detected at the monthly recap. According to SAP, the platform serves as a visibility and analytics layer, not a replacement for the kaizen culture.
Lean focuses on eliminating the seven wastes and speeding up flow, while Six Sigma focuses on statistically reducing variation and defects, targeting fewer than 3.4 defects per million opportunities. The two are complementary and are often combined into Lean Six Sigma: lean speeds up the process, Six Sigma ensures consistency.
Kaizen (Japanese for “change for the better”) is a culture of continuous improvement through small steps carried out by all employees, especially operators. Kaizen is the application of the fifth lean principle, perfection. There is no “done” state. Improvement goes on continuously, without end.
The three types of waste (“3M”) in the Toyota Production System: muda (non-value activity, which is the seven wastes), mura (unevenness in load or flow), and muri (overburden on people or machines). The popular seven wastes are really only the muda category; mura and muri are often missed.
Waste that is not recorded in reports rarely shrinks from new tools alone. Reduction happens when the five lean principles are applied consistently and waste is made visible. Lean manufacturing is fundamentally a discipline of continuous improvement, not just a temporary project. As an SAP Platinum Partner through United VARs, with experience since 1998, Soltius implements and supports SAP Digital Manufacturing to provide near-real-time visibility on the production floor across manufacturing industries.
To discuss implementing lean manufacturing and improving production-floor visibility through SAP Digital Manufacturing at your company, visit soltius.co.id.